Comments on: Meter Change Out in Maximo for Transportation https://maximoconcepts.com/2017/01/16/meter-change-out-in-maximo-for-transportation/ Concepts Simplified. Thu, 05 Dec 2019 21:09:30 +0000 hourly 1 https://wordpress.org/?v=6.5.2 By: PK https://maximoconcepts.com/2017/01/16/meter-change-out-in-maximo-for-transportation/#comment-112 Thu, 05 Dec 2019 21:09:30 +0000 https://maximoconcepts.wordpress.com/?p=425#comment-112 In reply to Doug Wohlers.

I am afraid I don’t. I wrote this article long time ago and I dont have access to that VM anymore.

]]>
By: Doug Wohlers https://maximoconcepts.com/2017/01/16/meter-change-out-in-maximo-for-transportation/#comment-111 Thu, 05 Dec 2019 20:07:01 +0000 https://maximoconcepts.wordpress.com/?p=425#comment-111 In reply to Doug Wohlers.

Also a dump of the assetmeter table for the meter?
Thanks,
Doug

]]>
By: Doug Wohlers https://maximoconcepts.com/2017/01/16/meter-change-out-in-maximo-for-transportation/#comment-110 Thu, 05 Dec 2019 20:02:55 +0000 https://maximoconcepts.wordpress.com/?p=425#comment-110 Do you have a screen shot of the meter history? And/Or a dump of the meterreading table for that meter?
Thanks,
Doug

]]>